Washington, North Carolina, established in 1776, was the first town in America named for George Washington.
Follow this link to skip the navigation and go straight to this page's content City of Washington, NC
    


Permit and Inspection Fees


City Code of the City of Washington, North Carolina
Chapter 4, Article 1, Section 4-7
effective July 1, 2000

(2) Commercial Fee Schedule


a.  Any work started without a required permit will be charged the original fee plus a penalty equal to the original fee (i.e. original fee is $25.00, penalty fee is $25.00, the total cost will be $50.00).
b.  New and additions, cost per square foot, per floor:
     1. Building and insulation permit
     2. Electrical permit:
     3. Plumbing permit:
     4. Heating and/or A/C permit:
     5. Minimum permit fee:
     6. Insulation permit:
$ 0.12
$ 0.05
$ 0.05
$ 0.05
$25.00
$25.00
c.  Accessory buildings, porches, decks, etc.,
     cost per square foot, per floor:
     1. Building and insulation permit:
     2. Electrical permit:
     3. Plumbing permit:
     4. Heating and/or A/C permit:
     5. Minimum permit fee:
     6. Insulation permit:
$ 0.07
$ 0.03
$ 0.03
$ 0.03
$25.00
$25.00
d. Re-shingle or shingle permit
$25.00
e. Moving of buildings
$100.00
f.  Electrical inspection for lights
$25.00
g. Siding installation
$25.00
h. Demolition of buildings
$100.00
i.  Repairs, change of service, sewer
     1. $1.00 to $5,000 construction cost
     2. Each additional $1,000 construction
        cost (per thousand)
$30.00

$ 2.00
j.  Reinspection fee
$25.00

Go to:
(1) Residential Fee Schedule

(3) General Inspection Fee Schedule


spacer

Copyright  by the City of Washington. All rights reserved. Last edited 3/4/2008.
Powered by
GovHost.com

Link to the City of Washington website home page.Link to the City of Washington web site policies.Send e-mail to cityinfo@washingtonnc.ws.